Home > Undefined > Change over

Change over

Phone line: I haven’t had one of those in years.

DSL service: I’m sick and tired of Comcast and their monthly rate increases.

DirecTV: I’ll order this too once I figure out how many TVs and which kind…

Painting: I hate painting. The office needs one final touch-up and it will be finished.

Wallpaper Removal: Is taking the contractor longer than expected. Big surprise. The stuff, just will not come off that walls. Once it is off, I’ll need to figure out how to smooth then back down for painting.

Bathroom remodel. I’ve ripped out the cabinet and found tile under it. Tile? But the floor is linoleum? Now I get to pull the subfloor. They built up the floor to match the height of the tile instead of removing everything down to the subfloor in the first place. So… I have 3 layers of flooring to remove to get back to the joists then I can lay down a good, solid, waterproof subfloor. I can put anything of top of that. A clean, simple tile would be my first choice. We’ll see how the recoating of the tube and tile surround goes…

Garage: Tool cabinets are in place. Peg board is up. I’ve started putting things away. I ordered a storage cabinet. Hopefully, that will eliminate the need of a crappy little filing cabinet that I have been using to store oil and spray cans in.

Yard: I need to mow the grass. I haven’t mowed grass in over 2 years. I guess I need to track down some lawn mower oil and buy gasoline for the lit’ sucker.

S2R: I changed the levers on the Monster. The Pazzos fit perfectly and reduced the reach to an acceptable level. The next thing will be a new clutch slave cylinder. I’ve got a rear stand on order and frame sliders are coming, although I am not sure that I will like them.

Tags:
  1. No comments yet.
  1. No trackbacks yet.
You must be logged in to post a comment.